Technical inspection of the Iki-Burul water pipeline
GOVERNMENT OF THE REPUBLIC OF KALMYKIA
In 2016, the Iki-Burul group water pipeline was built, with a length of 200 km, with connection to the Severo-Levokumskoye underground water field. Until 2021, the property was not officially accepted on the balance sheet of the operating organization, an inventory was not carried out, there were no actual data on the condition of buildings, structures and equipment.
A full technical survey was carried out in accordance with the Order of the Ministry of Construction of the Russian Federation No. 437/PR, more than 10,000 inventory cards were compiled, a hydraulic model was built, scenarios for the operation of the Iki-Burul group water pipeline were developed with the construction of a financial model that takes into account capital and operating costs.
Построенные очистные сооружения не работали в проектном режиме, очистка сточных вод осуществлялась некорректно. Целью работ являлось выяснение соответствия фактически выполненных работ по монтажу
и вводу в эксплуатацию очистных сооружений проектным решениям.
В процессе обследования выявлены нарушения технологических режимов эксплуатации оборудования: конструктивные недостатки, некорректные настройки процессов дозирования реагентов, несоответствие проектных и фактических объемов сточных вод, поступающих на очистку и пр.
Разработано заключение, которое явилось основанием для защиты прав и интересов заказчика в суде.
In 2016, the Iki-Burul group water pipeline was built, with a length of 200 km, with connection to the Severo-Levokumskoye underground water field. Until 2021, the property was not officially accepted on the balance sheet of the operating organization, an inventory was not carried out, there were no actual data on the condition of buildings, structures and equipment.